asis far west namibia
Sinking and Equipping of a Prospect Shaft
750m |

Dwarsrivier
Capital Development & Stoping 100 000 tons
per month

mt isa mine australia
Underground: Sub Vertical Shaft |
Raiseboring, sliping & lining, station
cutting and equipping 710m shaft.

ZCCM
zambia
Equipping of shaft. Installed steelwork in
the Mindola Sub-vertical shaft re-deepening
project. |
bCL
botswana
Raise Boring of 1 shaft: 980m x 3,5m Ø |
bCL botswana
Raise Boring of 2 shafts: 1 x 188m x 3,1m Ø;
1 x 148m x 3,1m Ø |
bCL botswana
Raise Boring of 1 shaft: 755m x 3,50m Ø |
ekathi canada
Raise Boring of 1 shaft: 304m x 4,0m Ø |
freeport indonesia
Raise Boring of 4 shafts: 4 x 620m x 4,10m Ø |
konkola zambia
Sinking & Equipping of the Pipe Shaft 4,8m Ø
980m deep & Development works at No’s 1 and
3 Shafts |
lepanto mine philipines
Parallel declines 900m and the sink, line
and equipping of a sub-vertical Shaft ± 350m
at 6m Ø. |
otjihase Mine - Namibia
The driving of ±1 450m of 6m (W) x 4m (H)
decline roadway at inclinations of up to 7°
below the horizontal & widening of existing
4m (W) x 3m (H) gallery to 8m for 690m |
rubicon lithium mine namibia
Decline & Exploration Reef
Development ± 700m. Hand held machine & LHD
used, ramp + flat development. |
shashe mines botswana
Sinking & Equip Vertical Shaft 320m
Deep, 6 stations, 2 water settling dams |
Selebi Phikwe botswana
Construction of a 7,8m Ø x 946m deep # c/w
raisebored rock pass & ventilation systems,
attendant stations primary development,
crusher, station, sumps, etc.
|